Performance to Schedule

The presumably simple determination of whether production is on or behind schedule. It is not often an easy determination, especially in a repair environment. The easiest way to determine performance to schedule is to have the smallest possible time intervals within which a schedule abnormality can be detected.

See muraheijunka and kitting.

Call or email us for a free assessment, at 801-467-1287