The total amount of time needed to produce a product if it could be immediately and instantly moved from operation to operation without waiting. Also called the Critical Path.
See production efficiency and lead time.
Grow Your Top and Bottom Lines
The total amount of time needed to produce a product if it could be immediately and instantly moved from operation to operation without waiting. Also called the Critical Path.
See production efficiency and lead time.