Flow applied to Laying of Railroad Track

This is an interesting video of a train that lays its own track.  The leading unit pulls up the old ties, lays down new, with new rails and all the connecting hardware and ballast.  It still takes a lot of people, but the rate that track is laid down is truly amazing.

Call or email us for a free assessment, at 801-467-1287